Fronius solar inverter error 1030: WSD shutdown chain open

Risk level
High
Professional inspection is recommended.
Urgency
High
Quick answer
Error code 1030 (WSD Open) on a Fronius Symo GEN24 or Symo GEN24 Plus inverter means the Wired Shut Down safety chain is open and the unit has stopped feeding power into the grid, while the operating status LED lights up or flashes red.
Safety first
Stop and check this first
- Danger due to electrical voltage on live parts of the photovoltaic system: never open the inverter or touch the surge protection device (SPD) or WSD terminal; installation and connection of an SPD may only be carried out by Fronius-trained service personnel.
- Never bypass an external emergency stop switch, central grid and system protection relay, or external SPD feedback contact that has opened the WSD safety loop.
Safe checks you can perform
- Check the operating status LED on the front of the inverter without opening the housing
- Read the 1030 WSD Open entry in the inverter user interface or Fronius Solar.web
- Visually check whether an external emergency stop switch has been actuated
Leave these tasks to a qualified professional
- Do not attempt this professional task: Inspect the surge protection device (SPD) and its 2-pin signal cable
- Do not attempt this professional task: Verify the push-in WSD terminal, factory bypass, and WSD master/slave switch
What a technician must be able to justify
Technician visit
These are the steps they must carry out and show you. Tick them as they work: if steps are skipped, do not accept a part swap.
These are not instructions for opening or handling the equipment yourself. They are the checks that should support a technical conclusion.
Inspect the surge protection device (SPD) and its 2-pin signal cable
What they doAfter disconnecting the photovoltaic system on all pins and all sides, securing against re-activation, waiting 2 minutes for inverter capacitors to discharge, and verifying de-energization with a suitable measuring device, Fronius-trained service personnel check whether the SPD mechanical indicator has turned from green to red and inspect the 2-pin signal cable.
They must show youthe mechanical indicator color on the surge protection device (green vs. red) and the condition of the 2-pin SPD signal cable.
In writingthe SPD inspection findings and, if the SPD tripped, the repair or replacement report completed by Fronius-trained service personnel.
Verify the push-in WSD terminal, factory bypass, and WSD master/slave switch
What they doThe specialist checks the push-in WSD terminal in the data communication area to ensure either the factory-installed standard bypass or a valid trigger device/WSD chain is properly wired on the IN and OUT pins, and verifies the WSD switch is in position 1 on the primary device and position 0 on secondary devices.
They must show youthe WSD switch position (1 for WSD primary device, 0 for secondary device) and the bypass or WSD chain wiring at the terminal.
In writingthe verified WSD terminal setup and confirmation in System > Event Log that code 1030 has cleared.
Before accepting a part or repair
Nothing has been shown yet. Do not accept a part swap based on the code alone.
Follow these steps
Note: Follow the documented order. An error code identifies the affected system, but it does not prove by itself which part has failed.
Check the operating status LED on the front of the inverter without opening the housing
- Who:
- you, looking at the outside of the Fronius Symo GEN24.
- How:
- inspect the operating status LED on the front cover of the inverter without removing any enclosure panel or turning the DC disconnector.
- Result that matters:
- confirming visually whether the inverter is still held in a Wired Shut Down state.
- If the operating status LED flashes red or stays lit red:
- error 1030 is still active and grid feed-in remains interrupted.
- If the LED returns to steady green after an external control is restored:
- verify in Fronius Solar.web that power feed-in has resumed.
- Evidence to keep:
- a photo of the inverter front showing the red operating status LED.
Evidence: Fronius Symo GEN24 6-10 kW Plus and 6-12 kW Plus SC Operating Instructions (042-22092026)
Read the 1030 WSD Open entry in the inverter user interface or Fronius Solar.web
- Who:
- you, using your browser or mobile app.
- How:
- open the inverter user interface under System > Event Log (or under Notifications in the user menu) or check Fronius Solar.web to record the exact timestamp when 1030 WSD Open occurred.
- Result that matters:
- knowing when the shutdown happened and whether it coincided with a thunderstorm or recent installation work.
- If it appeared during a lightning storm or surge event:
- the internal or external surge protection device (SPD) has likely tripped.
- If it appeared right after commissioning or service work:
- the factory WSD bypass or the master/slave WSD switch may be misconfigured.
- Evidence to keep:
- a screenshot of System > Event Log or Fronius Solar.web showing 1030 WSD Open.
Evidence: Fronius Symo GEN24 6-10 kW Plus and 6-12 kW Plus SC Operating Instructions (042-22092026)
Visually check whether an external emergency stop switch has been actuated
- Who:
- you, by outside visual inspection only.
- How:
- if your system includes an accessible external emergency stop switch or external protection panel, look from the outside to see if it was pressed or tripped without opening any electrical enclosure.
- Result that matters:
- ruling out an accidental manual shutdown before booking a service visit.
- If no external emergency switch is actuated or fitted:
- contact an authorized Fronius specialist company to inspect the WSD circuit and SPD.
- If an emergency switch was actuated for a safety reason:
- do not reset it until the underlying hazard has been cleared.
- Evidence to keep:
- notes on any external shutdown controls checked and the time of the check.
Evidence: Fronius Symo GEN24 6-10 kW Plus and 6-12 kW Plus SC Operating Instructions (042-22092026)
Still not solved
If the error persists, stop here. See what the technician must do and show you.
Where this code applies
A code is meaningful only inside the right product and version context.
Primary scope
- System
- Solar and energy
- Brand
- Fronius
- Product type
- Solar inverter
Known code variants
- 1030 WSD Open
- Fronius 1030
- Fronius GEN24 error 1030
- Fronius Symo GEN24 1030
- WSD Open 1030
What it means
In the Fronius Symo GEN24 and Symo GEN24 Plus operating instructions (version 042-22092026), status code 1030 (WSD Open) indicates that the Wired Shut Down (WSD) signal line has been interrupted and the inverter has stopped feeding energy into the grid. The code appears in the inverter user interface under System > Event Log, under Notifications in the user menu, and in Fronius Solar.web, while the operating status LED lights up or flashes red. It can be caused by a tripped surge protection device (SPD), an external emergency stop or central grid protection contact, a damaged 2-pin SPD signal cable, or a missing factory bypass. An error code alone never proves that a part is defective.
Warnings and stop conditions
- Highsource verified
Danger due to electrical voltage on live parts of the photovoltaic system: never open the inverter or touch the surge protection device (SPD) or WSD terminal; installation and connection of an SPD may only be carried out by Fronius-trained service personnel.
Evidence: Fronius Symo GEN24 6-10 kW Plus and 6-12 kW Plus SC Operating Instructions (042-22092026)
- Mediumsource verified
Never bypass an external emergency stop switch, central grid and system protection relay, or external SPD feedback contact that has opened the WSD safety loop.
Evidence: Fronius Symo GEN24 6-10 kW Plus and 6-12 kW Plus SC Operating Instructions (042-22092026)
Symptoms and causes
Probable causes · in order
- Tripped surge protection device (SPD) or interrupted 2-pin SPD signal cableCommon
The internal or external surge protection device monitored via the WSD input has tripped (its mechanical indicator changes from green to red), or the 2-pin signal cable of the surge protection device is interrupted or damaged.
Evidence: Fronius Symo GEN24 6-10 kW Plus and 6-12 kW Plus SC Operating Instructions (042-22092026)
- External trigger device activated or failure of another inverter in the WSD chainPossible
An external trigger device connected in the WSD line (such as an emergency stop switch, fire alarm contact, or central grid and system protection) has opened the circuit, or the primary (master) inverter or a secondary (slave) inverter in a multi-inverter WSD chain has failed.
Evidence: Fronius Symo GEN24 6-10 kW Plus and 6-12 kW Plus SC Operating Instructions (042-22092026)
- Factory-installed WSD bypass removed without a trigger device or WSD switch not in position 1Less common
The factory-installed standard bypass on the push-in WSD terminal was removed without installing a trigger device, or the WSD switch on the primary device is not set to position 1 (WSD primary device).
Evidence: Fronius Symo GEN24 6-10 kW Plus and 6-12 kW Plus SC Operating Instructions (042-22092026)
Virtual technician
Does 1030 still appear after these checks?
Answer a few questions to narrow down the likely cause and the safest next action. Guidance only - it never replaces a professional.
Sources and technical references
- 1
Fronius Symo GEN24 6-10 kW Plus and 6-12 kW Plus SC Operating Instructions (042-22092026)
Fronius International GmbH · 2026 · official_doc
- 2
Fronius Symo GEN24 6-10 kW Plus y 6-12 kW Plus SC Manual de instrucciones (042-22092026)
Fronius International GmbH · 2026 · official_doc
Was this entry useful?