SMA inverter event 1302

Verified with sources1 sourceReviewed Aug 23, 2026
Technician coming? See what they must show you
Wall-mounted solar photovoltaic inverter
AsurnipalCC BY-SA 4.0Image source

Risk level

Critical

Stop using the equipment and contact a professional.

Urgency

Immediate

Quick answer

SMA defines event 1302 as: One or more line/neutral conductors are not detected; grounding, grid topology or country-data configuration may be wrong. The useful next discriminator is the recorded phase/neutral state and commissioned grid topology. Preserve the event before any reset.

Safety first

What to do now

  • Preserve the exact event context

    Save event 1302, timestamp, inverter model/serial, firmware, red-LED state, affected phase/string, power and weather before clearing anything.

  • Collect one safe discriminator

    Leave the inverter disconnected. Record recent commissioning, protection or grid-parameter changes; do not open the AC board or reconnect conductors. Record the recorded phase/neutral state and commissioned grid topology; do not change multiple parameters or circuits at once.

  • Respect the electrical stop point

    Do not reconnect until a qualified electrician verifies conductor assignment, protection, grounding, topology and the authorized country data set.

What you must never do

  • Do not attempt this professional task: Measured handoff for SMA 1302

What a technician must be able to justify

A technician is coming

These are the steps they must carry out and show you. Tick them as they work: if steps are skipped, do not accept a part swap.

These are not instructions for opening or handling the equipment yourself. They are the checks that should support a technical conclusion.

  1. Measured handoff for SMA 1302

    What they doWith the system safely isolated, verify L/N/PE assignment, conductor continuity, transformer earthing, grid topology and the authorized country data set before energizing.

Before accepting a part or repair

Nothing has been shown yet. Do not accept a part swap based on the code alone.

Where this code applies

A code is meaningful only inside the right product and version context.

Primary scope

System
Solar and energy
Brand
SMA
Product type
Solar inverter

Known code variants

  • événement SMA 1302
  • evento SMA 1302
  • inversor SMA 1302
  • inverter SMA 1302
  • onduleur SMA 1302
  • SMA Ereignis 1302
  • SMA event 1302
  • SMA inverter 1302
  • SMA Wechselrichter 1302
  • Sunny Tripower X 1302

What it means

Official meaning: One or more line/neutral conductors are not detected; grounding, grid topology or country-data configuration may be wrong. Decision boundary: capture the recorded phase/neutral state and commissioned grid topology. With the system safely isolated, verify L/N/PE assignment, conductor continuity, transformer earthing, grid topology and the authorized country data set before energizing.

Warnings and stop conditions

  • Criticalsource verified

    Incorrect AC conductors or grounding can cause lethal shock and fire. Keep the inverter disconnected and use a qualified electrician.

    Evidence: SMA Sunny Tripower X event messages

Sources and technical references

  1. 1

    SMA Sunny Tripower X event messages

    SMA Solar Technology AG · 2026 · official_doc

Sources: SMA Sunny Tripower X event messagesreviewed 2026-08-23 · verified