- Solar and energy
- Solar inverter
313
Fronius inverter event 313

Risk level
Critical
Stop using the equipment and contact a professional.
Urgency
Immediate
Quick answer
Fronius defines event 313 as: DC input voltage on MPPT 2 is too high. The useful next discriminator is DC voltage on the named MPPT, string layout and design maximum. Preserve the event before any reset.
Safety first
What to do now
- Preserve the exact event context
Save event 313, timestamp, inverter model/serial, firmware, red-LED state, affected phase/string, power and weather before clearing anything.
- Collect one safe discriminator
Record the full event sequence, firmware and LED state. Do not open the inverter or repeat restarts; export diagnostics if the UI allows it. Record DC voltage on the named MPPT, string layout and design maximum; do not change multiple parameters or circuits at once.
- Respect the electrical stop point
If the red LED or event returns, stop cycling power and send the diagnostic package to Fronius or a qualified installer.
What you must never do
- Do not attempt this professional task: Measured handoff for Fronius 313
What a technician must be able to justify
A technician is coming
These are the steps they must carry out and show you. Tick them as they work: if steps are skipped, do not accept a part swap.
These are not instructions for opening or handling the equipment yourself. They are the checks that should support a technical conclusion.
Measured handoff for Fronius 313
What they doExport diagnostics, confirm firmware and event sequence, then test the named internal monitoring path through Fronius service procedures before considering hardware replacement.
Before accepting a part or repair
Nothing has been shown yet. Do not accept a part swap based on the code alone.
Where this code applies
A code is meaningful only inside the right product and version context.
Primary scope
- System
- Solar and energy
- Brand
- Fronius
- Product type
- Solar inverter
Known code variants
- événement Fronius 313
- evento Fronius 313
- Fronius Ereignis 313
- Fronius event 313
- Fronius inverter 313
- Fronius Symo / Eco 313
- Fronius Wechselrichter 313
- inversor Fronius 313
- inverter Fronius 313
- onduleur Fronius 313
What it means
Official meaning: DC input voltage on MPPT 2 is too high. Decision boundary: capture DC voltage on the named MPPT, string layout and design maximum. Export diagnostics, confirm firmware and event sequence, then test the named internal monitoring path through Fronius service procedures before considering hardware replacement.
Warnings and stop conditions
- Criticalsource verified
The inverter contains hazardous stored and live energy. Do not open it or bypass internal protection.
Evidence: Fronius Symo / Eco status diagnostics
Sources and technical references
- 1
Fronius Symo / Eco status diagnostics
Fronius International GmbH · 2025 · official_doc
Was this entry useful?